NEM generation: sources & method
An independent informational chart built from public Australian Energy Market Operator (AEMO) data. It does not reuse Whitehaven’s widget code or Global-Roam’s data service.
Measurements and time
The source is AEMO NEMWEB’s Dispatch SCADA files. Each file reports instantaneous MW at the start of a five-minute dispatch interval. The chart shows this sample time, calculated as the file’s settlement / interval-ending time minus five minutes. All displayed times are AEST (UTC+10), including during daylight saving.
The page checks every five minutes while visible. The server caches successful retrievals for up to four minutes. These are the latest available published samples, not second-by-second live measurements. Samples over 15 minutes old are labelled delayed. A failed download, malformed file, or active unit without a verified fuel/region mapping cannot silently replace verified data. If automatic data is unavailable, the chart may show a clearly labelled historical AEMO dashboard snapshot.
What is counted
QLD, NSW (including the ACT NEM region), VIC, SA and TAS only. WEM/WA and the NT are excluded. The chart sums positive readings for mapped generating and bidirectional units. Scheduled loads, charging / pumping demand and negative generator readings are excluded. This is positive metered output, not net system generation or demand. Rooftop solar is not included. Battery discharge is included as Battery, not counted again as its original charging source.
Coal combines black and brown coal. Gas includes registered natural gas, coal-seam gas, waste coal-mine gas and ethane units. Liquid fuels covers liquid-only registered units such as diesel and kerosene. Biomass and mixed-fuel units are shown separately. Hydro, wind, solar and battery are separate grey categories. Fuel groups describe registered capability, not a real-time measurement of which fuel a dual-fuel plant is burning. Zero and unreported values are kept distinct. Small positive values below 1 MW are displayed as <1. Shares use the displayed positive-output total.
The historical fallback retains the AEMO dashboard’s own fuel classifications, with coal combined and Liquid Fuel labelled Liquid fuels. Mixed-fuel output is not separately identified in that fallback. It is not method-identical to the automatic unit-level chart.
Unit classification and coverage
The primary mapping is AEMO’s NEM Registration and Exemption List, “PU and Scheduled Loads” sheet, downloaded 4 November 2026. Duplicate physical-unit rows are checked before mapping by DUID. Blank DUIDs and aggregate identifiers are supplemented using AEMO’s September 2026 MMSDM DUDETAILSUMMARY, DUALLOC and GENUNITS tables.
One documented correction places MLB01 (Mortlake battery) in Victoria, matching the effective MMSDM region and AEMO’s 2026–27 marginal loss factors report, Table 12, rather than the NSW value in the registration workbook. Five reserve identifiers with unknown fuel remain unclassified and can only pass validation when their readings are zero. Any nonzero unknown requires review. Mapping changes and new units require ongoing maintenance.
Measured interconnector flows
Flows come from AEMO’s public DispatchIS reports, INTERCONNECTORRES.METEREDMWFLOW. These are beginning-of-interval SCADA readings, not the MWFLOW dispatch targets used by some dashboards. The map includes QNI, Directlink, VIC–NSW, Heywood, Murraylink, Basslink and EnergyConnect. A positive source value runs from the registered FROM region to the TO region; a negative value reverses it. The displayed number is the absolute MW value with a direction arrow. Moving dots are teal for exports from each link’s fixed reference state and red for imports into it: NSW for QNI, Directlink and EnergyConnect; VIC for VIC–NSW, Heywood and Murraylink; TAS for Basslink. Each tooltip and expanded reading identifies that reference, while the arrows always show the measured direction. Zero has no arrow, and missing data is shown as unavailable, never as zero.
During dual intervention cases, the physical dispatch case (INTERVENTION=1) is selected; otherwise case 0 is used. The nominal sample time is the interval end minus five minutes. Readings older than 15 minutes are labelled delayed. Animation pauses on delayed or retained data; its speed is decorative and does not represent the speed of electricity. The shapes and routes are schematic, not asset locations. The state boundaries use public-domain Natural Earth data, with Queensland teal and other NEM states grey.
Attribution and use
Data: Australian Energy Market Operator. Processing and visualisation: Coal Queensland. AEMO’s copyright policy grants general attributed reuse of AEMO-created public material. Its generation-data page describes these files as informational and not intended for commercial use, and does not guarantee accuracy or availability. This widget is provided for informational interest, not trading, operational or investment decisions. No endorsement by AEMO or the reference widget providers is implied.
Wholesale spot prices use AEMO’s separate public summary feed. They have their own source timestamps and are not household tariffs.
Method and mapping reviewed 4 November 2026 AEST.